No | Nama Peserta | A | K | T | Penawaran | Penawaran Terkoreksi | Hasil Negosiasi | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|
1 | AMA CONSTRUCTION - 90.910.215.4-654.000 | Rp. 197.599.850,78 | Rp. 197.599.850,78 | Rp. 197.377.850,78 | |||||||
2 | BORNEO RAYA - 02.533.229.7-654.000 | Rp. 198.121.445,01 | Rp. 198.121.445,01 | ||||||||
3 | CV CAWAN KONSTRUKSI - 62.496.654.5-657.000 | Rp. 198.437.758,40 | Rp. 198.437.758,40 |
- A Evaluasi Administrasi
- K Evaluasi Kualifikasi
- T Evaluasi Teknis
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak